Get a demoExplore data

Bitcoin miner repurposes former sustainability-focused EU data center prototype

The facility was originally built with the Research Institute of Sweden to address the need for more energy efficient data centers

article-image

ivan_kislitsin/Shutterstock modified by Blockworks

share

Crypto miner Hive Digital Technologies is repurposing a Sweden data center formerly used by the European Union as a prototype to test energy efficiency and sustainability.

The facility is set to house Hive’s ASIC servers to increase the company’s mining capacity by roughly 300 petahash, Hive Executive Chairman Frank Holmes told Blockworks.  

It was previously constructed as part of EU Horizon 2020 — a research and innovation funding program that ran from 2014 to 2020 with a budget of roughly 80 billion euros ($88 billion). Horizon Europe has since succeeded that program. 

The goal of what was known as the Boden Type Data Center was “to build the prototype of the most energy and cost-efficient data [center] in the world,” according to a project brief.

The prototype comprised a fresh air cooling system and evaporative cooler apparatus “using solely harmonic free renewable energy,” it adds. 

Read more: Why did Cambridge revise its bitcoin electricity consumption index?

Johanna Thörnblad, president of Hive’s Swedish operations, confirmed to Blockworks this former prototype facility is the data center Hive has purchased. 

“This data center was initially built together with the Research Institute of Sweden to address the need for more energy efficient data centers,” she told Blockworks in an email. “It has since been expanded to include four additional buildings using low-carbon and locally sourced building materials.” 

The site is near Hive’s existing Boden facility and no more than 500 meters from the city’s hydro plant, Thörnblad said. The data center runs on renewable hydro energy and relies on air and evaporative cooling technologies.

“Hive has always had a strong focus on sustainability and this data center fits very well into our strategy,” Thörnblad added.

HIVE acquired the property with a payment structure that includes up to $750,000 in cash and up to $1.5 million in common shares of the company. According to an announcement from the company, the common shares portion is to be paid in two installments, with the share price determined by specific conditions related to the TSX Venture Exchange’s closing prices.

Holmes noted the data center was most recently in private hands, declining to disclose the owner. The company, which was involved in high-performance computing, sought to sell ahead of the bitcoin halving slated for April — an event expected to put financial pressure on segment players. 

Read more: At anniversary of 2016 BTC halving, a look to the next one

The purchase comes just months after the company formerly known as Hive Blockchain Technologies changed its name as it shifted its focus to supporting the growth of artificial intelligence.

Holmes said the Vancouver-based company looks to continue expanding in British Columbia, Manitoba, Ontario and Quebec. Competitors such as Marathon Digital have recently shared plans to continue diversifying geographically. 

“Buying this facility right beside us is just another long-term vision of the great digital transformation that we’re putting long-term assets on our balance sheet,” Holmes said.

Updated Nov. 28, 2023 at 1:40 pm ET: Modified headline to emphasize Hive’s bitcoin mining functions.


Get the news in your inbox. Explore Blockworks newsletters:

Tags

Decoding crypto and the markets. Daily, with Byron Gilliam.

Upcoming Events

Marina Bay Sands Singapore

October 7, 2026

DAS Asia is a a single-day summit at Marina Bay Sands Singapore featuring conversations between the builders, investors, and global leaders are shaping the trajectory of the digital asset ecosystem in Asia & North America.

Hilton Park Lane, London

November 10-11, 2026

DAS London is a two-day summit at the Hilton Park Lane in London featuring conversations between the builders, allocators, and policy makers who are shaping the trajectory of the digital asset ecosystem in the UK, Europe, and North America.

Javits North

March 30-April 1, 2027

DAS NYC is a three-day summit at Javits North bringing together the builders, allocators, and policymakers shaping the future of digital assets across institutional finance and global markets.

recent research

Sponsored Article Template - DoubleZero White.png

Research

Every distributed system inherits the physical limitations, or advantages, of the network it runs on. Physics-bound systems can optimize their execution layers, compress their state, and parallelize their runtime, and still lose time they cannot recover to the speed of light through fiber and the routing decisions of carriers that are not optimized for consensus. The public internet routes traffic by least cost, not best performance. For a system where the order and timing of messages determine who earns and who loses, that is a structural tax and a measurable networking design flaw for traders.

The daily brief, in your inbox

Markets, protocols, and policy, read by 200K+ professionals.

Blockworks Inc.133 W 19th St., New York, NY 10011

Solutions

InvestorsExchangesEnterprisesOnchain Businesses

© 2026 Blockworks Inc.

TermsPrivacy PolicyPrivacy CenterNews Archive